LUCIA, Monterey County — October 28, 2026. Motorists traveling on Highway 1 south of the Lucia area should watch for construction traffic control at the Limekiln Creek Bridge. The Transportation Agency for Monterey County (TAMC) lists core drilling from Monday, October 26, through Friday, October 30, as part of its published October 25–31 Cone Zone Report.

What restrictions are listed?

TAMC describes alternating one-way traffic control along the south end of Limekiln Creek Bridge, continuing to the end of the structure, generally from 8 a.m. to 4 p.m. The agency says motorists may encounter delays of approximately 10 minutes. That number is a schedule estimate, not a live prediction for an individual trip.

Why do crews drill cores at a bridge?

Core drilling is a method for examining physical material or site conditions, often used in engineering investigation and preparation for repairs. The regional traffic notice identifies the work type but does not state the results, contractor or next construction phase. It therefore would be inaccurate to announce that the bridge is being rebuilt or has already passed a new inspection based solely on this traffic notice.

Is Highway 1 closed all day?

The published notice concerns an alternating one-way movement, not an announced full closure of all travel through Lucia. Other segments of Highway 1 may have separate closures or restrictions, particularly following major fires and slope damage. Weather and operating conditions can shift the schedule. Never bypass traffic controls or rely on this archived schedule as proof of conditions at a specific hour.

Where to check live access

Motorists can consult TAMC’s weekly Cone Zone Report, Caltrans QuickMap and the responsible highway agencies before traveling through remote coastal areas. Cell service may be limited, so download directions and bring sufficient supplies for possible delays.

Primary source: Transportation Agency for Monterey County, Cone Zone Report, October 25–31, 2026. This is a dated construction schedule for the Limekiln Creek Bridge, not a new landslide or a guarantee that work is active today.

YOUR LOCAL NEWSPAPER NEEDS YOU

Help this community newspaper grow

Your support helps build coverage for the people and places this local newspaper serves.

Donate once by card ↗
Help Lucia News grow Help strengthen reporting on Lucia: community voices, important decisions and local life.
Support Lucia News

Choose how to support Lucia News:

Credit / Debit Card via Stripe

Choose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Lucia News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
Optional support through the publisher. Contributions are not advertised as tax-deductible and never buy editorial influence.

Lucia News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Lucia News newsroom →

More from Lucia News

Explore more local reporting and community updates on the newspaper homepage.

Visit Lucia News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.